Planned improvements to Harts Lake Road South at its crossing with Horn Creek (CRP 5916) are intended to replace the existing culvert, including the following:

  • Removing the existing 48" culvert.
  • Constructing a concrete structure. This structure will have two lanes with paved shoulders.

Project Timeline

Fall 2019 to Winter 2020: Surveying, preliminary engineering and right-of-way plans.


Winter 2020 to Spring 2022: Right-of-way acquisition, environmental documentation, construction plans, specifications and estimates.


Summer 2022: Construction begins.