Sumner-Buckley Highway East - 258th Avenue East to West Mason Avenue (CRP 5914)

What’s Happening

Engineering: We are beginning the design engineering for the project. Currently we are gathering information about the existing site conditions and initiating contact with utility companies.


Land: All improvements are expected to fit within the existing right-of-way.


Survey: County surveyors will be in the area gathering field data of the project area.

Image of the project vicinity map.
Image of project photo.

About the Project

Planned improvements to Sumner-Buckley Highway East from 258th Avenue East to West Mason Avenue (Buckley City Limits) are intended to preserve the existing roadway. The improvements would include the following:


  • Resurface the roadway with an asphalt overlay.
  • Replace some guardrail segments.
  • Regrade a section of the roadway side slope.

Project Timeline

January 2020 to early 2022: Field data collection, design engineering, development of construction plans, specification and estimate.


Spring 2022: Begin construction.

Contact Us

Gregory Hess, P.E.

Design Supervisor

Phone: (253) 798-2283

Address:

2702 S 42nd Street, Suite 109

Tacoma, WA 98409