Engineering: Pierce County has completed a field survey and is in the preliminary design stage.
Land: Right-of-Way needs will be evaluated.
About the Project
Planned improvements at Cromwell Drive Northwest (CRP 5866) are intended to stabilize the failing slope on the north side of Cromwell Drive Northwest just east of 56th Avenue Court Northwest. Improvements include installing a slope stabilization system.
Project Timeline
Fall 2018 to Fall 2019: Surveying, preliminary engineering and right-of-way plans.
Fall 2019 to Spring 2021: Right-of-way acquisition, environmental documentation, construction plans, specifications and estimates.