12th Street East (18th Avenue East to 23rd Avenue East) (CRP 5872)
Bid Opening was held on Friday, March 1, 2019


See all Invitations to Bid and Results of Recent Bid Openings

What were the Contract Bids


The Contract Bid Tabulations can be found in the attached link:

Bid Package for 12th Street East (18th Avenue East to 23rd Avenue East) (CRP 5872)
Detailed information on the project specifications and contract plans can be found in the attached links:

About the Project


Planned improvements to 112th Street East from 18th Avenue East to 23rd Avenue East (CRP 5872) will resurface the roadway pavement and reconstruct curb ramps to current ADA accessibility standards. The improvements will include the following:

  • Removing and repaving the top 2-inches of asphalt concrete pavement from 18th Avenue East to 23rd Avenue East.
  • Replacing curb ramps at the 18th Avenue East, 22nd Avenue East, and 23rd Avenue East intersections with 112th Street East.
Improvements to the 112th Street East/Portland Avenue East intersection were completed within the last 2 years and are not included as part of this project. 