Whiteman Road SW Culvert Repair (CRP 5829)

Location pin
Camera
Rolled up paper icon

What's Happening


Engineering: Pierce County is in the final stages of design engineering for the project. 

Land: Right-of-Way and/or Temporary Easements are being acquired.

Survey: A topographic survey has been acquired.

Environmental:
Necessary environmental permits will be obtained.

About the Project


Planned improvements for Whiteman Road SW - Culvert Repair (CRP 5829) are intended to repair a failing culvert under Whiteman Road SW. Improvements will include sealing all joints within the culvert with rubber sleeves.

Project Timeline


Summer 2019: Project construction, single lane closures may occur.
Contact Us
Send a message arrow
Kraig Shaner, P.E.
Bridge Supervisor
Phone: (253) 798-2764
Address:
4301 South Pine Street, Suite 628
Tacoma, WA 98409